| |
|
|
| |
|
The Rail: "Step one, You're almost done!"
|
 |
- Measure up 84" from the floor. Use a level to draw a level line at this height.
- Place the rail on the wall so this line is visible through the mounting holes. Circle each mounting hole along the level line. No need to align holes with studs.
- Drill each mounting hole with a 5/16" drill bit.
- If you do hit a stud, you may use a smaller 5/32" pilot hole with the screw (no anchor required).
- Insert anchors into 5/16" holes. Do not twist or turn anchors.
- Place rail over anchors. Hand-tighten screws.
- Using a drill, tighten each screw. IMPORTANT: Allow screw to turn 6-8 full rotations after it is flush to the rail so the anchor tightens into a ball behind the drywall.
- Place cover stickers over each screw head.
|
|
The Rail
Uprights and Brackets
Rod Clips
Chrome Rod and Rod Stops
Shelving (Ventilated)
Shelving (Wood)
O-Boxes |
|
|
|
| |
|
|
|
|